|
Bateman Litwin successfully provided a gas compression station to Uzbekneftegaz at Shurtan field in Uzbekistan.
The project mode was Lump Sum turnkey. The total value of this project was US$165 million.

Uzbekneftgas needed to have the ability to maintain the pressure of raw natural gas (10.5 MPa) at the delivery point to the Gas Complex Preparation Unit at Shurtan Field. Bateman offered a total solution, which included: Engineering Procurement and Construction Supervision of a Booster Compression Station (BCS), plus supply of piping package, and associated equipment.

Back to top |